Atec JDSU-FIT Series Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Zařízení Atec JDSU-FIT Series. Atec JDSU-FIT Series User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 4
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
COMMUNICATIONS TEST & MEASUREMENT SOLUTIONS
www.jdsu.com/inspect
Essential Tools for
Fiber Handling
FIT-S105-PRO
FIT-S115-PRO
FINISH THE JOB IN LESS THAN HALF THE TIME! (average time to inspect, clean, and test 1 port)
Keep everything together
Fiber inspection
Cleaning
Power measurement
Fault detection
Free your hands for other tasks
Logging data
Accessing equipment
Routing cable
Stop fumbling with multiple tools
These essential tools are now integrated
together in a single system
Drive behavior for best practices
Test the same way every time
Proactively inspect
Inspect both sides
Use clean test leads
Document data
Inspecting and Testing Fiber Is Now Easier and Faster Than Ever
As fiber penetrates further into next-generation networks, proactively inspecting and cleaning each
connection point is no longer optional, but critical. Using only an optical power meter when testing fiber is an
outdated and high-risk practice. Today’s fiber technician needs a tool kit that provides a seamless workflow for
inspecting, cleaning, testing and troubleshooting a fiber link. Replacing standalone tools with an integrated
test system dramatically improves throughput and productivity. When that test system is designed to
promote an Inspect Before You Connect workflow, it controls technicians behavior and drives them to follow
best practices to produce a better performing fiber network. JDSU combines these essential fiber handling
tools into a fast, portable, and easy-to-use system for any fiber technician.
STEPS
1
INSPECT test lead
2
CLEAN and RE-INSPECT
test lead
3
INSPECT bulkhead port
4
CLEAN and RE-INSPECT
bulkhead port
5
TEST and LOG results
6
MOVE to next port
6
:03
in seconds
5
:15
4
:15
3
:07
2
:05
1
:10
New Process 55 seconds
6
:18
in seconds
5
:15
4
:30
3
:25
2
:20
1
:20
Legacy Process 128 seconds
Zobrazit stránku 0
1 2 3 4

Shrnutí obsahu

Strany 1 - FIT-S115-PRO

COMMUNICATIONS TEST & MEASUREMENT SOLUTIONSwww.jdsu.com/inspectEssential Tools for Fiber HandlingFIT-S105-PROFIT-S115-PROFINISH THE JOB IN LESS T

Strany 2 - Kit Contents

www.jdsu.com/inspectNORTH AMERICATEL: 1 866 228 3762FAX: 1 301 353 9216LATIN AMERICATEL: +1 954 688 5660 FAX: +1 954 345 4668ASIA PACIFICTEL: +85

Strany 3 - FIT-S215-PRO

COMMUNICATIONS TEST & MEASUREMENT SOLUTIONSwww.jdsu.com/inspectEssential Tools for Fiber HandlingFIT-S205-PROFIT-S215-PROFINISH THE JOB IN LESS T

Strany 4

www.jdsu.com/inspectNORTH AMERICATEL: 1 866 228 3762FAX: 1 301 353 9216LATIN AMERICATEL: +1 954 688 5660 FAX: +1 954 345 4668ASIA PACIFICTEL: +85

Komentáře k této Příručce

Žádné komentáře